Kids Magnesium Gummies - White Label Formula

PET Bottle
Doypack
Product Description
Ingredients & Specs
Usage & Safety
Manufacturing & Delivery

Kids Magnesium Gummies are formulated for white-label brands seeking to support relaxation, muscle function, and energy metabolism in children.

Magnesium plays a key role in maintaining calmness, reducing restlessness, and promoting overall well-being.

Each serving provides 240 mg Magnesium and 1 mg Vitamin B6, helping support muscle relaxation, mood balance, and sleep quality.*


Ingredients

Magnesium Citrate, Vitamin B6, Pectin, Citric Acid, Sodium Citrate, Coconut Oil, Natural Peach Flavor, Sweeteners (Maltitol Syrup, Erythritol).

Contains: No gelatin, no gluten, no added sugar.
Flavor: Peach
Product Amount: 60 gummies per bottle
Net Weight: 180 g


Suggested Use

Children 4 years and older: take one (1) gummy daily or as directed by a healthcare provider.


Caution

Use under parental supervision.
Consult a healthcare professional if your child is on medication for attention, anxiety, or sleep.


Warning

Keep in a cool, dry place away from sunlight.
Do not exceed the recommended dose.

Download the Kids Magnesium Gummies Product Specification (PDF)

Take 2 gummies daily, preferably with food.

Do not exceed recommended daily dose.
Consult a healthcare professional if pregnant, nursing, or taking medication.
Keep out of reach of children.


Manufactured under EU standards (GMP & HACCP certified)

Lead time: 6–8 weeks after label approval

Shipping:
Worldwide shipping available
Freight calculated based on quantity and destination
Custom Manufacturing

Need a Custom Formula? Start with Formula Review

Looking for specific active ingredients, custom shapes, or unique flavors? We offer full contract manufacturing starting at 5,000 units.

Build Your Custom Gummy →

FAQs

How does the white-label process work?

What are your minimum order quantities (MOQ)?

What’s included in the white label package?

Can I customize the flavor, color or shape?

How is shipping handled?

What is the production lead time?